04Subdivision & titles

88E Positive Covenants and Restrictions on Use

Councils often require a restriction on the use of land and a positive covenant on the title before the occupation certificate, most often for an OSD tank. We define the affected area and prepare the documents using your council's standard wording.

When you need it

Is this the survey you need?

  • Your consent requires a restriction and positive covenant over the OSD tank before the occupation certificate
  • A pump-out or basement stormwater system has to be maintained by the owner
  • Council requires an overland flow path, flood or minimum floor level restriction
  • A rainwater tank, bushfire or building envelope restriction is a condition of consent
  • Your certifier asks for proof the covenant has been registered on title

What's included

What we survey and show

  • Review of the consent conditions and council's required wording
  • Survey of the OSD tank or other system as built, where needed
  • Plan or sketch defining the area of the restriction or covenant
  • Instrument drafted with council's standard restriction and positive covenant terms
  • Coordination with council for execution
  • Documents prepared for registration on the title with NSW LRS

Good to know

What section 88E does

Section 88E of the Conveyancing Act 1919 lets prescribed authorities, such as councils, impose restrictions on the use of land and positive covenants on a title. A positive covenant makes the owner, and every future owner, responsible for something, such as keeping an OSD tank clean and maintained, and lets council step in and recover costs if it is not done.

Using council's own wording

Each council publishes its own standard terms for OSD systems, pump-out systems, overland flow paths, flood areas and more. We use the current wording for your council so the documents are accepted first time, and define the affected area so it matches the as-built works shown on the works-as-executed plan.

How it works

From quote to signed plan

  1. CH 0.00

    Send the consent

    The consent conditions and any council template you were given.

  2. CH 25.00

    Define the area

    We survey the as-built system where needed and define the affected area.

  3. CH 50.00

    Prepare documents

    The plan or sketch and the instrument are prepared with council's wording.

  4. CH 75.00

    Execution & registration

    Council signs, and the documents are lodged for registration on the title.

What you get

Delivered to you

  • Plan or sketch of the affected area
  • Instrument with council's standard terms
  • Signed PDF

Checked and signed by Taha Abdo, Registered Surveyor SU010105.

Who it's for

We send the files to you, or straight to your architect, builder, engineer or certifier.

  • Builders
  • Homeowners
  • Developers
  • Certifiers & engineers

Questions

Common questions

Why does my OSD tank need a covenant?

Council needs the tank to keep working for the life of the building. The positive covenant puts the maintenance obligation on the title, so it passes to every future owner, and the restriction stops the tank being altered or built over without consent.

Is this the same as an 88B instrument?

They do a similar job. An 88B instrument is lodged with a new plan, such as a subdivision. An 88E instrument is imposed by the council or authority itself, often on an existing lot after a new house or duplex is built.

Do I need a WAE survey as well?

Usually, yes. The works-as-executed plan shows the OSD system as built, and the covenant area is defined from it, so the two are normally done together.