Formwork, Slab and Floor Level Checks
Level checks confirm the building is in the right position and at the right height before the next stage goes on top. A check at formwork or frame stage costs far less than fixing a slab later.
When you need it
Is this the survey you need?
- The formwork is up and the slab pour is booked
- The certifier asks for a survey of the slab or floor level
- Checking the first floor before framing continues
- The roof frame is up and the ridge must be under the approved height
- The site is flood affected with a minimum floor level
- A setback looks tight and needs confirming before walls go up
What's included
What we survey and show
- Formwork position checked against the boundaries and set out
- Formwork height checked against the design slab level
- Slab and finished floor levels (FFL) on AHD
- First-floor level checks
- Frame and ridge height against the approved maximum
- Setbacks from the boundaries to the structure
- Results compared with the approved plans, with differences noted
- Signed check sent to the builder, ready for the certifier
Good to know
Why check at formwork stage
Once concrete is poured, the slab's position and height are fixed. Checking the formwork first catches boxing in the wrong place, or set too high or too low, while it is still easy to move. The check confirms the slab will sit at the design level on AHD and at the right distance from each boundary. Builders often book it just before a pour, so tell us your pour date when you book. That way the check is done in time.
Floor and ridge heights
Consents often limit floor levels and building height, and flood-affected sites usually have a minimum floor level. A first-floor check confirms the upper level before framing goes further, and a ridge check confirms the roof is under the approved height. Each result is reported against the approved plans, so the certifier sees surveyed numbers rather than tape measurements, and any issue is clear early.
How it works
From quote to signed plan
- CH 0.00
Book the stage
Tell us the stage, the pour or inspection date, and send the approved plans.
- CH 25.00
Site check
Position and heights are measured from the boundaries and benchmark.
- CH 50.00
Compare
Results are compared with the approved plans and any differences flagged.
- CH 75.00
Signed result
The builder receives a signed check to keep and pass to the certifier.
What you get
Delivered to you
- Signed check report
- Levels on AHD
- Setbacks confirmed
Checked and signed by Taha Abdo, Registered Surveyor SU010105.
Who it's for
We send the files to you, or straight to your architect, builder, engineer or certifier.
- Builders
- Homeowners
- Certifiers & engineers
Questions
Common questions
Do I need a formwork check if you did the set out?
It is worth doing. Formwork is built by hand from the set out pegs, and small errors creep in. A check before the pour is the last easy chance to fix position or height.
What will my certifier need?
It varies. Many certifiers ask for a surveyor's check of the slab or floor level and setbacks at key stages, and a ridge height check where the building is near its height limit. Send us your construction certificate conditions and we will tell you what they call for.
Can you check a slab that is already poured?
Yes. We measure its position and level and compare them with the plans. If there is a difference, you have the exact figures to discuss with your certifier and designer.