?FAQ
Questions we get asked every week.
Which survey you need, what to send us, what happens on site and what you get at the end. Still unsure? Call 0415 742 688.
Choosing a survey
Which survey do I need for a DA?
Most development applications need a detail and level survey signed by a registered surveyor, with levels to AHD. Many councils also want boundary information, especially for work near a boundary. Check your council's lodgement guide or ask your designer. If you are unsure, send us the address and a short description of the project and we will tell you what we think council will expect.
What is the difference between a detail survey and a boundary survey?
A detail survey shows what is on the site and its levels: buildings, trees, walls, services and contours. A boundary survey determines where the legal boundaries are on the ground. Designers need the detail survey to design. Councils and builders often also need the boundaries confirmed. For most new homes, duplexes and subdivisions you need both, and doing them together saves a second visit.
Do I need a survey to replace a fence?
You don't have to, but if you and your neighbour want the new fence on the true boundary, a boundary identification survey is the reliable way to find it. Old fences are often off the line. We can identify the boundary and place marks so the fencer can build to them. The plan shows where the old fence sat in relation to the boundary.
What does a builder need from a surveyor?
Usually a set out once the construction certificate is issued, then level and position checks at key stages such as formwork and frame, and a final survey for the occupation certificate. Some jobs also need work-as-executed surveys of stormwater or civil works. Using the same surveyor for each stage keeps the boundaries and levels consistent through the build.
Before we start
What do you need from me for a quote?
The property address, what the survey is for, and any plans you already have, such as architectural drawings or the council consent. If you know the lot and DP number, include it. Tell us about anything unusual, such as a steep site, locked access or a dog. With that we can give you a fixed-fee quote that covers the work properly.
Do I need to be home when you survey?
Not usually. We need safe access to the whole site, including the backyard and side passages, and any gates unlocked. Please secure pets and let tenants know we are coming. For boundary work we may need to look for marks along the boundary and at the front, so clear access to fences and corners helps.
On site
What is AHD and why does it matter?
AHD is the Australian Height Datum, the national reference for heights. Levels to AHD mean your survey ties into the same height system council, flood studies and engineers use. Most councils ask for DA survey levels to AHD. It matters most on flood-affected sites and wherever floor levels, driveways or stormwater must meet a set height.
Will you leave marks on the ground?
It depends on the job. A set out leaves pegs or marks for the builder. A boundary identification can include marks at corners or offsets if you need them, for example for a fence. A subdivision leaves new boundary marks and reference marks as the regulations require. A detail survey on its own usually leaves only small control points. We verify the scope with you before we quote, so you know exactly which marks will be placed.
Plans & files
What files do I get?
For detail surveys you receive a signed PDF plan and a DWG CAD drawing that your architect, designer or engineer can work in. For set outs and most other surveys you typically receive a signed PDF. If you need CAD or another format for a particular job, ask when you request the quote and we will confirm what we can supply.
Who signs the plan?
Taha Abdo, NSW Registered Land Surveyor SU010105. He does the quote, the fieldwork and the checking, and signs every plan himself. Councils and certifiers commonly ask for the surveyor's name and registration number on the plan, and they appear on ours.
How long is a survey plan valid for council?
It varies by council. Canterbury-Bankstown's DA guide asks for a survey no more than six months old at lodgement, and Cumberland's lodgement guide says no more than 12 months. Others ask for a current survey. If your plan is older or the site has changed, we can usually update our own survey rather than start again. The quote will explain what is involved.
Subdivision & strata
Can I subdivide my block?
That depends mainly on the zoning, the minimum lot size and other controls in council's planning rules, plus the shape of the lot and any easements. A town planner can give you the planning answer. We can check the title, the DP and the site and explain what the survey side of a subdivision involves before you commit.
Strata or Torrens title for my duplex?
With strata, each dwelling is a lot and shared areas are common property managed by an owners corporation. With Torrens, each dwelling sits on its own lot of land. What council allows, finance and resale are questions for your planner, solicitor and lender. Feel free to reach out to have a chat.
What is an 88B instrument?
A section 88B instrument is the document lodged with a plan that creates easements, restrictions or positive covenants, such as a drainage easement or a restriction on building in part of a lot. The plan shows where each one sits and the 88B sets out its terms. We prepare 88B instruments with our plans when they are needed.
Who lodges the plan with Land Registry Services?
Since 1 July 2025 every plan in NSW must be lodged online through NSW LRS Connect, and only a registered surveyor can set up the Connect workspace and plan number and sign the plan. We prepare the plan, administration sheets and 88B instrument and lodge them through Connect. Your solicitor or conveyancer handles any related dealings, such as transfers, on their own platform. LRS examines the plan and may ask for corrections before it registers it and issues new titles.
Costs & timing
How much does a survey cost?
It depends on the type of survey, the size and slope of the site, how much is on it, and how complex the boundary evidence is, including the age of the boundaries and their original marks. Sight lines across the site, access and the files you need also matter. We look at your address and plans first, then give you a fixed-fee quote so you know the cost before work starts.
How long will it take?
Time depends on our booking calendar, the size and complexity of the site, and for subdivisions, on councils, certifiers, utility providers and Land Registry Services. We confirm the timing in the quote. If you have a deadline, such as a DA lodgement date or a concrete pour, tell us up front and we will say honestly whether we can meet it.
What can change the price after I accept the quote?
The fixed fee covers the work described in the quote. It changes only if the scope changes, for example extra areas, more design revisions, extra site visits for a builder, or a site very different from what we were told. If that happens we tell you before doing the extra work, so there are no surprises on the invoice.
Get a quote
Send us the address.
We come back with a fixed fee that lists exactly what is included. Not sure which survey you need? Tell us what you are building.