03During construction
Civil and Stormwater Set Out
Stormwater, OSD and driveways only work if they are built at the right line and level. We set them out from the engineer's design so pipes fall the right way and tanks sit at their design heights.
When you need it
Is this the survey you need?
- Laying stormwater lines to the street or through an easement
- Installing an OSD tank or rainwater tank at design levels
- Building a driveway that must meet council's crossing levels
- Setting out kerb, gutter or a layback required by the consent
- Your engineer needs the drainage built as designed before the WAE
What's included
What we survey and show
- Review of the stormwater and civil design
- Pits, pipe lines and junctions set out in position
- Invert and pit levels marked as cut or fill on pegs
- OSD tank corners, base, orifice and outlet levels
- Driveway edges, grades and crossing levels
- Kerb and gutter line and level
- Benchmark checked against the design datum
- Notes on any clash between the design and the site
Good to know
Getting the fall right first
Stormwater design is often tight on fall, especially on flat blocks or where a pipe has to reach a kerb outlet or an existing pit. A few centimetres can decide whether water drains or backs up. Setting out pits and pipe lines to the engineer's levels before digging lets the drainer build to the design. It also gives early warning if an existing pit or service is not where the drawing shows it.
OSD tanks and driveways
An on-site detention tank has to hold a set volume and release water through an outlet at a set level, so its size and heights matter to council. Driveways have their own limits, such as grades and the level where they meet council's crossing at the boundary. We set out both from the approved design so the work is built right the first time. That makes the later works-as-executed survey a check rather than a problem.
How it works
From quote to signed plan
- CH 0.00
Send the design
Stormwater, OSD and civil drawings, plus any council crossing levels.
- CH 25.00
Design check
Design levels are checked against the site and benchmark before work starts.
- CH 50.00
Line and level
Pits, pipes, tanks and edges are pegged with cut or fill.
- CH 75.00
Further stages
Later stages are set out as the drainer or civil contractor needs them.
What you get
Delivered to you
- Line & level pegs
- Levels on AHD
- Cut/fill marked on pegs
Checked and signed by Taha Abdo, Registered Surveyor SU010105.
Who it's for
We send the files to you, or straight to your architect, builder, engineer or certifier.
- Builders
- Developers
- Certifiers & engineers
Questions
Common questions
What height datum do you use?
We use AHD, which is what most engineers' designs and council levels are based on. If a design uses an assumed datum, we tie it to the site benchmark and tell you how the two relate.
Can you set out the OSD tank and then do the WAE?
Yes, and doing both keeps the records consistent. The set out puts the tank where it is designed, and the works-as-executed survey later shows what was built for the engineer and certifier.
What if an existing pit is at a different level to the design?
We tell you and your engineer before the pipe is laid. Adjusting a design at that point is far easier than digging up and relaying a line after the WAE shows it does not work.
Get a quote
Send us the address.
We come back with a fixed fee that lists exactly what is included. Not sure which survey you need? Tell us what you are building.